免费在线观看国内色片网站网址_日本韩国黄黄免费在线_福利视频网址_2017天天天天做夜夜夜做_老师在办公室被躁得舒服视频_一级二级毛片_美女视频黄是免费视频_久久e热在这里只有精品99_日韩人妻无码精品中文字_欧美自拍亚洲综合在线,五月天婷婷四房网址,久久香蕉国产线看观看精品免费,三级黄色在线观看

Modular housing

Rapid construction
  • Two parallel lines for factory production and
    on-site construction
  • Construction time is only
    1/3 of traditional construction methods
Structure safety
    • Suitable for seismic precautionary intensity of eight
    • the stress system remains unchange
    VARIETY OF HOUSE TYPES
    • Decoration options
    • Flexible portfolio
    Comfortable and liveable
    • Noise reduction
    • Heat preservation and insulation
    • Reduce risk of water leakage
    項(xiàng)目案例
    Project Cases
    • Shenzhen Longhua Huazhang Xinzhu

      The total construction area of the project is approximately 170,000 m2, with 5 buildings of 28 floors and a height of 99.7 m. Through multi-dimensional planning and product comparison, the optimal number of buildings, optimal epidemic prevention layout, optimal products, and optimal earthwork are worked out, making it an innovative project for talent housing in the post-epidemic era.

      It is China's first high-rise concrete MiC project and China's tallest modular building.

    • Welfare Service Complex Project in
      Hong Kong Kwu Tung North Zone 29

      This eight-storey concrete Welfare Service Complex, with a construction area of approximately 40,000 m2, consists of 1,764 MiC modules (approximately 24,063 tons), 441 semi-prefabricated floor slabs (approximately 731 tons), 98 staircases (approximately 375 tons), and 7 garbage chutes (approximately 26 tons).

      This project marks the first application of concrete MiC in Hong Kong.

    • Staff dormitory building of China
      State Construction Hailong Zhuhai

      This building with a total construction area of approximately 6,200 m2 has seven floors , including an equipment room on the ground floor and staff dormitories on the 2nd to 7th floors. It offers 24 single rooms, 48 double rooms, and 72 triple rooms, providing a total of 144 beds. The ground floor is cast-in-place, while the 2nd floor and above are prefabricated using 153 concrete MiC modules and integrating 48 bathrooms.